|
The White Pass & Yukon 70 class 'Mikes' |
BACK |
![]() |
| Two 70 class 'Mikes' after sand blasting, await the attention of the paint shop. |
Stages of fabrication...
| A look underneath. The Running Boards, Air Reservoirs, Power Reverser, and Westinghouse brake pump have been attached. The foot on the cab pedestal is tapped to accept the mechanism. | ![]() |
|
![]() |
The mechanism is now virtually complete with Cylinders, Pilot. deck with braces and steps. The Walshaerts valve gear is complete. |
|
| Topside the various detail parts have been added: Stack, Domes, Bell, Light, Handrails, Running Boards, Generator, Pump, and various valves complete with piping. | ![]() |
|
| Another side view, showing the "plumbing" details. | ||
| Looking into the Cab some of the control fittings are visible. The hinged fallplate will ride on the tender deck. The etched window frames are still to be fitted. | ![]() |
|
![]() |
An Oil burning tender ready to be attached to its frame. | |
| Looking down on the tender top showing the various Oil pipes and valves attached. | ![]() |
|
![]() |
| The body and mechanism mated, tender ladder in place and nearly ready to run. |
statistics about the kit:-
| See the Locomotive Price Lists for details of how to order this as a kit or RTR. | |
| www.railmaster.co.nz Railmaster Exports for Railways, Collectables, Figures and Auto kits..............................May 03, 2006 | |